Installing a new driveway or dropping a kerb might seem like straightforward home improvements, but they often involve navigating planning regulations. Many homeowners are surprised to learn that these projects frequently require official permission from their local council.

A homeowner consults with a local council representative regarding the installation of a new driveway and drop kerb, pointing to a map and showing the proposed location

For most driveway installations, planning permission is not required if you use permeable (porous) materials or provide drainage solutions that prevent water runoff onto public roads. However, dropped kerbs almost always require permission since they involve modifying council-owned pavements and potentially affect traffic flow and pedestrian safety.

The requirements vary significantly between local authorities, with conservation areas and listed buildings subject to stricter regulations. Additionally, if your driveway connects to a classified road (A, B or C road), you’ll likely need approval regardless of the materials used.

Key Takeaways

Understanding Planning Permission Requirements

A suburban home with a car parked in front, showing a new driveway and drop kerb installation

Planning permission for driveways and dropped kerbs involves specific regulations that vary by location and property type. Before starting any work, it’s essential to understand what permissions are needed from your local council to avoid potential fines or required modifications.

Distinguishing Between Driveway and Dropped Kerb

Driveways typically don’t require planning permission when using permeable materials such as gravel, permeable concrete or porous asphalt. These materials allow water to drain naturally, reducing flooding risks. However, permission becomes necessary in several situations:

Dropped kerbs always require permission as they involve modifying public highways. This modification enables vehicles to cross the pavement safely without damaging the kerb or footpath. The council must approve this work to ensure it meets safety standards and doesn’t interfere with utilities beneath the pavement.

The Role of Local Councils in Permission Grants

Local councils serve as the primary authority for both driveway and dropped kerb permissions. They evaluate applications based on several key factors:

Each local authority maintains specific policies regarding these installations. In conservation areas, councils typically impose stricter requirements to preserve architectural character and historical significance.

The application process usually involves submitting detailed plans, paying fees (typically £150-£300), and possibly arranging a site visit from a highways officer. Processing times vary between councils, typically taking 4-8 weeks for standard applications.

Criteria for Driveway Installation

A suburban street with a new driveway and drop kerb being installed in front of a house. A measuring tape, shovel, and construction materials are scattered around

Installing a new driveway involves adhering to specific regulations regarding size, design, and placement. These criteria ensure your driveway complies with local planning guidelines and maintains neighbourhood aesthetics while providing practical access to your property.

Size and Design Regulations

Driveways must typically conform to minimum width requirements of 2.4 metres for a single car and 4.8 metres for a double car space. The standard depth should be at least 4.8 metres to accommodate most vehicles without overhanging the pavement.

Local authorities often have specific rules about permeable surfaces. Many councils now require sustainable drainage solutions (SuDS) for new driveways to reduce flood risks. This means using permeable materials such as:

The driveway gradient should not exceed 1:10 (10%) to ensure safe vehicle access, particularly in adverse weather conditions. Some conservation areas have additional restrictions on materials and designs to preserve local character.

Impact on Public Footway and Footpath

Any driveway installation that crosses a public footway requires a dropped kerb. This modification ensures pedestrian safety and prevents damage to the pavement structure. The local highways authority must approve these alterations.

The position of your driveway entrance must provide adequate visibility for both drivers and pedestrians. Standard requirements include visibility splays of 2.4m x 43m on roads with a 30mph speed limit.

Driveways cannot interfere with existing street furniture including:

A minimum distance of 1.5 metres from such objects is typically required. Drainage considerations are crucial, as your driveway must not channel water onto the public highway. Some councils charge for dropped kerb applications and subsequent inspections.

Front Garden Considerations

Converting a front garden to a driveway impacts both aesthetics and environmental factors. Planning guidelines often require maintaining a balance between hard surfaces and green space. Many councils stipulate that at least 50% of the front garden area must remain planted.

Privacy concerns should be addressed through thoughtful design. Strategic placement of low hedges or decorative borders can maintain some separation from the street while complying with height restrictions. These typically limit front boundary features to 1 metre high.

Environmental considerations include:

The removal of boundary walls exceeding 1 metre in height generally requires planning permission. Listed buildings and conservation areas have stricter requirements to preserve architectural integrity. Your driveway design should complement your property’s character while meeting practical needs.

The Process of Dropping a Kerb

A construction worker uses a shovel to dig out the area in front of a residential property, preparing to install a new driveway and drop kerb

Dropping a kerb involves specific procedures that require authorisation from your local council. The process ensures safe vehicular access whilst protecting pedestrians and public infrastructure.

Initial Inquiry and Application

The first step in dropping a kerb is to contact your local council’s highways department. They will provide the necessary application forms and information about local requirements.

Most councils charge an application fee ranging from £50 to £200, which typically covers initial assessment costs. This application must include detailed plans showing the proposed location and dimensions of the dropped kerb.

Once submitted, a highways officer will visit your property to assess the feasibility of the proposal. They’ll check for underground utilities, drainage systems and other potential obstructions.

The assessment typically takes 4-8 weeks, after which you’ll receive approval, conditional approval, or rejection. If approved, you’ll need to hire a council-approved contractor to complete the work.

Guidelines for Visibility and Accessibility

Visibility plays a crucial role in dropped kerb applications. Your driveway must provide clear sightlines for both motorists and pedestrians to ensure safety.

The council typically requires a minimum visibility splay of 2.4 metres by 43 metres on roads with a 30mph speed limit. These measurements may vary based on the road classification and speed limit in your area.

Your dropped kerb must maintain accessibility for all pedestrians. The gradient cannot be too steep, and tactile paving may be required to assist visually impaired pedestrians.

The width of the dropped kerb must be appropriate for your vehicle access needs. Standard specifications allow for a width between 2.7 and 3.6 metres, whilst the crossover (the area between the road and your property) must have sufficient depth.

Mitigating Damage to Public Property

When dropping a kerb, protecting the public footway from damage is essential. The contractor must reinstate the pavement using materials that match the existing surface.

Any utilities beneath the footway, such as water pipes, gas lines, or telecommunication cables, must be identified and protected. The contractor may need to coordinate with utility companies if adjustments are necessary.

The work should include proper drainage solutions to prevent water pooling on the public footway. This typically involves installing a channel drain at the property boundary.

Heavy vehicles should not cross the footway until the concrete has fully cured. Your contractor will advise on the appropriate curing time, typically 7-10 days, to prevent cracking or subsidence.

The council will inspect the completed work to ensure it meets all specifications before issuing final approval.

Legal Considerations for Off-Street Parking

A homeowner consults with a local planning official about installing a new driveway or drop kerb outside their property

Creating off-street parking requires navigating specific legal frameworks that vary depending on your property and local regulations. Understanding permitted development rights and the requirements for new parking spaces can help homeowners avoid costly mistakes.

Permitted Development Rights

Most homeowners can create a driveway under permitted development rights, meaning planning permission isn’t required in many circumstances. However, these rights come with important conditions. The area must be surfaced with porous materials or include drainage provisions to prevent rainwater running onto public roads.

For front gardens larger than 5 square metres, non-permeable surfaces require planning permission. This regulation aims to reduce flood risks and environmental impact from excessive run-off.

Different rules apply for listed buildings or properties in conservation areas. In these cases, you’ll likely need full planning permission regardless of the driveway size or materials used.

The local authority may have additional regulations specific to your area, so checking with your council’s planning department before starting work is always advisable.

Creating a New Parking Space

When establishing a new parking space, you’ll need permission from the local authority to lower the kerb for vehicle access. This is a separate process from planning permission for the driveway itself.

Application costs vary between councils, typically ranging from £50 to £300. The council will assess whether your proposed access point poses any safety risks to pedestrians or other road users.

Key considerations include:

You may need a separate highways licence if work temporarily disrupts the pavement. This ensures public safety during construction.

Some councils have specific policies restricting off-street parking in certain neighbourhoods to preserve architectural character or ensure adequate on-street parking remains available.

Website Information and User Guidance

Our website provides comprehensive information about planning permissions for driveways and drop kerbs. Users can easily navigate through various sections to find relevant details about local council requirements and application processes.

The site employs cookies to enhance your browsing experience. These small text files help us understand site traffic patterns and improve overall functionality.

We collect anonymised data on how visitors interact with our content to optimise user experience. This allows us to identify which pages are most helpful and where additional information might be needed.

For optimal performance, we recommend using the latest version of your preferred browser. The site is fully responsive and works across desktop computers, tablets and mobile devices.

Important resources available include:

All information is regularly updated to reflect current regulations and requirements. The website adheres to accessibility standards, ensuring information is available to all users regardless of any disabilities.

Technical issues or difficulties navigating the site should be reported through our contact form. Feedback helps us continuously improve the website and address any concerns promptly.